PRISMA design process is almost completed and the program is approaching the opening of the final System CDR (S-CDR). This actually represents a delta CDR which aims at completing and freezing the system design with the introduction of some mission characteristics upgraded in the frame of the S-CDR loop itself. The S-CDR is fed, according to ECSS standards, by lower-level CDRs, which are most of them successfully concluded. |